Sl. No. |
Name of the Organization / Client |
Location |
Year |
Type of Consultancy works |
Consultancy Fee(in Rupees) |
Status of project |
1. |
E.Co. Railway, Mancheswar Workshop (T-211) |
Mancheswar, Bhubaneswar, Odisha. |
2012 |
Wiring design ,Drawing, Estimation and Supervision |
1,55,000 |
Completed |
2. |
GED, Laxmannath |
Laxmanant,Balasore |
2013 |
Pole positioning, sag Calculation , Load Calculation, Lux calculation |
1,21,400 |
Completed |
3. |
BMC ,BBSR |
Dumuduma, slum area |
2012 |
SLD for 110KVA Grid SS, System GA Plan and Elevation details , Earth Mate Design and supervision |
1,45,900 |
Completed |
4. |
AAI ,BBSR |
B.P. Artpo |
2012 |
Drawing & Design for 11KV S/s Control Room , Switch Yard, Cable Trench and Supervision. |
1,20,000 |
Completed |
5. |
ECOR, BBSR Stadium Work (T-228) |
BBSR |
2013 |
Drawing, Design ,Estimation of different lighting system |
1,00,000/- |
Completed |
6. |
Sr.DEE/TRD/KUR E.Co. Railway Khurda Road |
Malatipatpu, Khurda Road |
2016 |
Design, Drawing,Estimation and Supervisionfor Testing & Commissioning of Traction Sub-Station(TSS) along with Feeding Post, Capacitor Bank & SCADA at Malatipatpur station. |
2,10,000/- |
Continuing |
7. |
CESU, Puri, Grand Raod |
Grand road Puri , Odisha |
2014 |
Lux calculation , Drawing, Design ,Estimation and supervision of high Mast system and sound system |
1,66,000/- |
Completed |
8. |
GED, Vedavyas |
Electrical Section Bedabahal, Sundargarh, Sabdega, Bargaon and Kutra, under WESCO. |
2014 |
Drawing, Design ,Estimation and supervision of 11KV line, 33KV line, LT line & S/s |
1,68,000/- |
Continuing |
9. |
IDCO, Daitari |
OMC Ltd. Daitari |
2015 |
SLD Design ,Estimation and supervision for 132/33 KV Grid SS, System |
2,00,000/- |
Continuing |
10. |
MCL, Nandira, Jagannath Area, Talcher |
Nandira, Jagannath Area, Talcher |
2015 |
SLD Design ,Estimation and supervision for 132/33 KV Grid SS, System |
2,00,000/- |
Continuing |
11. |
PPT,Paradip(60 HM) |
Paradip Harbour area |
2015 |
Lux calculation , Drawing, Design ,Estimation and supervision of high Mast system |
1,15,000/- |
Continuing |